Utilities

The distribution networks people depend on — water, electricity and gas — and the evidence the regulator wants about them. Build with AI.

3live apps
13coming soon
12standards built in
EPA LCRR / LCRICA DDW LCRISDWAAWWACPUC HFTD (GO 95)CPUC PSPS rulesEnergy Safety WMPEPANETIEC 61970 / 61968 CIMMultiSpeakNERC FAC-003CGA 811
Our work

3 apps, live today

Each one runs today on live data. Open it, or see how it works first.

Cal OES outage reporting · CPUC D.21-06-034 partner portalsNetwork Operations Map

One picture of every California utility’s reported outages, shutoffs, Red Flag Warnings and fire-threat tiers for the people who depend on the grid, with a count of which of your sites lie inside a reported outage area.

EPA LCRI · California DDW inventory instructionsService-Line Inventory Portal

Reads a portfolio of California water systems against the 1 November 2027 non-lead rule, counts the unknown lines that stand in the way, and opens the State’s own address rows for each system.

CPUC HFTD · CPUC PSPS reporting · Energy Safety WMPWildfire Risk & PSPS Exposure

Reads every PSPS post-event report filed this season across utilities, and counts the circuits that meet Energy Safety’s definition of frequently de-energized, with their customers and fire-threat tier exactly as filed.

13 coming soon
Soon
Outage & Restoration Map

Current outages, customers affected, crews assigned, restoration estimates

Outage reporting practice
Soon
Asset Condition & Risk Register

Age, condition, criticality and hazard exposure per asset class

ISO 55000 · asset health
Soon
Network Asset Register

Mains, valves, hydrants and meters as an authoritative read-only service

AWWA asset practice · ISO 55000
Soon
Replacement Programme Tracker

Which lines are replaced, scheduled, verified — with cost and progress

LCRI replacement plan
Soon
Sampling & Water Quality Map

Sample sites, results and exceedances over time, publicly explainable

SDWA · EPA WQX
Soon
Leak & Non-Revenue Water Map

Prioritised leak investigation areas and confirmed finds with savings

AWWA water-audit method
Soon
Capital Improvement Prioritisation

Rank renewals by condition, criticality and consequence of failure

ISO 55000 · CIP practice
Soon
Works & Outage Notification Map

Planned works, shut-offs and boil-water notices for customers

Customer notification duty
Soon
Vegetation Risk & Trim Planner

Predicted encroachment, trim cycle priority and post-work verification

NERC FAC-003
Soon
811 / Damage Prevention Map

Ticket density, hit history and high-risk excavation areas

CGA best practices · 811
Soon
Stormwater & Drainage Asset Map

Drainage network, outfalls and flooding complaint history

MS4 permit reporting
Soon
Meter & Connection Registry

Every connection, meter and customer point as an authoritative layer

Connection data model
Soon
Field Crew & Work Order Map

Crew location, assignment and completion status in the field

Work management practice